Russellville High School

Crafton Tull Sparks

Crafton Tull Sparks

www.craftontullsparks.com
918-582-0229
Tulsa, OK 74119

Other Elements by this Professional

The $21 million dollar facility is planned to house a 2,000 seat performing arts auditorium, which will support new band, choir, drama and art spaces. The entire 152,000 SF project will include several renovations and additions, including a 16,000 SF science center. The design character of the new performing arts center facade will wrap around the front of the existing high school to create a new look and identity for the 35 year old facility.


Additional Info:

Theatrical equipment includes fly gallery, 2 lighting bridges and 2 light trees. Auditorium includes an orchestra pit, light & sound control room and 600 seat balcony. Band and choir areas consist of 12 practice rooms and 6 rehearsal rooms which includes a 7,000 SF band rehearsal room. The new facility has a blackbox theater/green room, dressing rooms, costume shop, stagecraft area and loading docks.


Materials:
Modular brick, split face CMU, ceramic glazed brick, clear anodized storefront, glass balcony railing EIFS, formed gypsum wall panels, burnished face CMU, modified bitumen roofing, performed metal fascia panels, carpet tile, porcelain tile, quartz epoxy countertops, stainless steel toilet partitions
High School : Russellville High School | Russellville, AR
Photos:

Crafton Tull Sparks