Campbell Center for the Performing Arts![]() Degenkolb Engineers415-392-6952 94104 This three-building complex consists of the Theatre building, the Scene Shop building, the Rehearsal Hall building, and corridors/walkways connecting the three buildings. A basement ground floor was constructed under the stage and auditorium area that houses the mechanical space, dressing rooms, support spaces, restrooms, and a lower lobby. Above the auditorium and stage is the upper tech gallery level containing the control room, a catwalk system, and tension grid over the stage. Additional Info: The project architect, Thomas Hacker Architects, and Degenkolb Engineers worked closely to create a community space for the Sacred Heart Schools. The schools serve 1,000 students in a co-educational, day use setting. | K-12
: Sacred Heart Schools | Atherton, CA![]() ![]() ![]() Photos: Upper Left: Robert Canfield |

Cairo American College



